 |
 |
Central Bank of China Headquarter
Peking
China |
|
Interior wall cladding of Central Bank of China in Peking (Beijin) executed with cut to size slabs thickness 3 cm. honed finished in Bianco Avorio.
Quantity: 6000 sqm. (= 64560 sqf.) |
|
SHOW DETAILS |
|
 |
 |
Ritz Carlton Portman Hotel
Shanghai
China |
|
Interior wall cladding of hall, restaurants and bar executed with cut to size honed slabs of thicnkess 4 cm..
Material: Bianco Avorio
Quantity: 4500 sqm (= 48420 sqf.) |
|
SHOW DETAILS |
|
 |
|
 |
|
 |
 |
SKIN ARCHITECTURAL SURFACES 2008
Milano
Italy |
|
GRASSI 1880 SPA partner of SKIN.
It is this extraordinary abundance of styles and architectural interpretations, this continuous flow from the global to the individual dimension that characterizes SKIN, the pathway exhibition organised within MADE Expo, Milan Architecture Design Building at the Mi... |
| SKIN ARCHITECTURAL SURFACES |
SHOW DETAILS |
|
 |
|
 |
|
 |
|
 |
 |
Private apartment
Vicenza
Italy |
|
Private apartment decorated with flooring and wall cladding of livingroom and bathrooms, sculpture panels, kitcken and bath tops, and stone table bases.
Main characteristic of this modest application is the combination of natural stones with stainless steel and wood.
Supplied materials: Giallo Dor... |
|
SHOW DETAILS |
|
 |
|
 |
 |
Luxury Apartments
Moscow
Russian Federation |
|
Interior floors and wall cladding executed in Giallo Dorato. |
|
SHOW DETAILS |
|
 |
 |
Hotel in Perth
Perth
Australia |
|
Interior wall cladding in cut to size slabs of Giallo Dorato honed finished.
|
|
SHOW DETAILS |
|
 |
 |
Metropolis Building
Auckland
New Zealand |
|
Exterior and Interior wall cladding in cut to size slabs of Giallo Dorato, thickness 3 cm., honed finished. |
|
SHOW DETAILS |
|